INSTALLATION GUIDEStage 2 & Stage 3 Full Installation Guide
MRS Installation Instruction Quick Start Guide
MAGICIAN RACE SOLUTIONS
Stage 2 & Stage 3 - Quick Start installation sequence.
Quick Start
Use this page as the installation sequence. The full instructions on the following pages explain each step in more detail.
- Identify your four primary vehicle integration connections: Battery Main power, constant 12V positive; Earth, battery negative; Key ON signal, switched 12V positive, present with ignition on and during cranking; and Key START signal, 12V positive only while the key is held in START.
- Disconnect the battery before beginning any wiring work.
- Mount the MRS fuse/relay box securely under the dash in a dry, accessible location.
- Install the firewall bulkhead hardware that suits your system, then route the harness through the firewall.
- Route the engine harness along its intended path and secure it clear of heat, sharp edges and moving components.
- Connect all labelled engine-side connectors and confirm each connector is fully seated and locked.
- Route and secure the cooling-fan and fuel-pump wiring. Run the fuel-pump wires rearward inside the vehicle under carpet/trim, protected from chafe or pinching, and use the supplied MRS bulkhead boot at the rear pass-through.
- Identify the vehicle circuits required for integration using the correct vehicle wiring information. Do not rely on wire colour alone.
- Connect the four primary vehicle-integration wires: Main Power - 12V+; Main Earth - Negative (-); Ignition ON - 12V+ switched; Starter Signal - 12V+ when cranking.
- Connect the required monitoring and auxiliary circuits: Tachometer / RPM Signal, Factory Oil Pressure Warning Light, Alternator Charge Warning Light, Reverse Lights, Factory Water Temperature and Gauge / Cluster connections.
- Before reconnecting the battery, complete continuity checks and verify all electrical connections are correct and secure. Ensure all required fuses are correctly installed.
- Reconnect the battery. With ignition ON, complete the pre-start electrical checks and verify the expected power and earth supplies.
- With ignition-coil power disconnected, secure and insulate the live coil-power terminal so it cannot contact earth or any conductive part. Crank the engine in short intervals and confirm oil pressure. Switch ignition OFF, then reconnect coil power.
- Start the engine and immediately confirm oil pressure. Verify warning lights, gauges and cluster functions operate correctly.
- Confirm alternator charging and correct charge-warning-light operation.
- Operate the cooling-fan manual override and verify both fans run.
- Allow the engine to reach operating temperature and confirm automatic cooling-fan operation.
- Complete a final inspection of harness support, connectors, firewall sealing, power/earth connections, fuel-pump wiring and all installed fasteners.
IMPORTANT
Do not rely on wire colour alone when integrating the MRS system into the vehicle. Identify factory circuits using the correct vehicle wiring information and confirm them electrically where practical.
Full Installation Instructions
1. Identify vehicle integration connections
Identify your four primary vehicle integration connections: Battery Main power, constant 12V positive; Earth, battery negative; Key ON signal, switched 12V positive, present with ignition on and during cranking; and Key START signal, 12V positive only while the key is held in START.
2. Preparation
Disconnect the battery. Lay out the MRS system and identify the engine harness, fuse/relay box, vehicle-integration wiring and firewall hardware supplied for the system stage. Confirm the planned harness route before drilling or mounting anything.
3. Mount the fuse/relay box
Mount the MRS fuse/relay box securely under the dash in a dry, protected and accessible location. Allow sufficient clearance for the harness, relays and fuses, and ensure the wiring cannot be pinched or damaged by trim, pedals or steering components.
4. Firewall bulkhead installation
Choose a suitable location on the firewall with adequate clearance on both sides. Keep the harness and bulkhead assembly away from excessive heat, sharp edges and moving components.
Stage 2 - Bulkhead plate and boot
Position the supplied MRS bulkhead plate in the chosen location and use the plate as a template to mark the centre opening and all mounting-hole positions. Measure the supplied M6 rivnuts to determine the required mounting-hole diameter and drill accordingly. Measure the supplied boot to determine the required centre opening size before cutting or drilling. Create the centre opening, drill the mounting holes, install the supplied M6 rivnuts and securely fasten the bulkhead plate. Pass the engine harness through the boot and ensure the boot is correctly seated and protects the harness around the firewall opening.
Stage 3 - Motorsport bulkhead connector
Position the supplied MRS bulkhead plate and motorsport bulkhead connector in the chosen location and use the plate as a template to mark the centre opening and all mounting-hole positions. Measure the supplied M6 rivnuts to determine the required mounting-hole diameter and drill accordingly. Measure the supplied motorsport bulkhead connector to determine the required centre opening size before cutting or drilling. Create the centre opening, drill the mounting holes, install the supplied M6 rivnuts, then securely fasten the bulkhead plate and connector. Connect the engine-side and cabin-side harnesses, ensuring the motorsport connector is fully seated and locked.
5. Route and secure the harness
Route the harness along the intended engine contour and branch positions. Keep all wiring clear of exhaust components, sharp edges, belts, pulleys and other moving parts. Support the harness at suitable intervals so no connector or branch carries the weight of the loom.
6. Connect engine-side components
Connect each labelled MRS connector to its corresponding engine component. Confirm every connector is fully seated and locked. Do not force a connector that does not positively match the component.
7. Fuel-pump and rear-harness routing
Route the fuel-pump wires through the vehicle interior toward the rear, under carpet or trim where practical. Secure and protect the wiring from chafing, pinching and moving components. At the rear pass-through, install the supplied MRS bulkhead boot correctly and seal it, then route and secure the wiring to the fuel pump.
8. Main vehicle integration
Complete the four primary connections using the labelled MRS wiring: Main Power - 12V+; Main Earth - Negative (-); Ignition ON - 12V+ switched; Starter Signal - 12V+ when cranking. Ensure the main power and earth connections are mechanically secure and suitable for the circuit load. Install the required main battery protection as specified for the system.
Vehicle Integration & Final Testing
This section covers all MRS wires that interface with the vehicle.
9. Factory cluster and auxiliary connections
Tachometer / RPM Signal:
Connect the labelled MRS TACHOMETER / RPM SIGNAL wire to the factory or aftermarket tachometer signal input. Verify the correct input using the manufacturer wiring information; do not identify the circuit by wire colour alone.
Factory Oil Pressure Warning Light:
Connect the labelled MRS wire to the factory cluster oil-pressure warning-lamp input. This is a switched-ground circuit from the sender; do not feed power into it.
Alternator Charge Warning Light:
Connect the MRS Alternator L wire to the factory charge-warning-lamp input. The L circuit must operate through the warning-lamp circuit; do not connect it directly to ignition power.
Reverse Lights:
At the gearbox reverse-light switch, connect the MRS power-in and power-out wiring so the switched output feeds the vehicle reverse-light circuit.
Factory Water Temperature / Gauges:
Complete the labelled factory water-temperature and required aftermarket gauge/cluster connections using the correct vehicle and gauge manufacturer information.
10. Cooling-fan manual override
Install the manual override switch in a suitable driver-accessible position and connect it to the labelled MRS fan-control wiring. The automatic temperature switch and manual override are both intended to trigger the cooling fans through the MRS relay control circuit.
11. Continuity and pre-start checks
Before reconnecting the battery, complete continuity checks and verify all electrical connections are correct and secure. Ensure all required fuses are correctly installed.
Reconnect the battery and complete the pre-start electrical checks. With ignition-coil power disconnected, secure and insulate the coil-power terminal. This terminal is live at 12V with ignition ON and must not contact earth or any conductive part. Crank the engine in short intervals and confirm oil pressure. Once oil pressure is confirmed, switch ignition OFF and reconnect coil power securely.
12. First start and final checks
Start the engine with coil power reconnected and immediately verify oil pressure. If oil pressure is not present, shut the engine down immediately. Once oil pressure is confirmed, verify alternator charging and correct charge-warning-light operation. Check the engine and fuel system for leaks and confirm that the aftermarket gauges and factory cluster operate as expected. Allow the engine to reach operating temperature, confirm automatic fan operation, then operate the manual override and verify both fans run.
13. Final review
Complete a final inspection of harness support, connector engagement, firewall sealing, power and earth connections and all installed fasteners. Take clear photographs of the completed installation from multiple angles and submit them to MRS with any notes or questions for review.
INSTALLATION PHOTOS & VIDEOS
Scan the final QR for installation photos, videos and supporting digital material.